A flow's Run history tab lists every run of that flow in your data retention period — when it started and finished, how long it took, how many records succeeded, were ignored, or errored, and who started it — including the retry jobs that reran failed records. Use it to find a particular run, see who canceled one, or follow a record through a retry. This article explains how to open the tab, what each column shows, and how to narrow the list by date, status, and run type. For all flows at once, use the Dashboard instead; see Monitor flows on the Dashboard.
Open the Run history tab
- Go to Build
> Flows, and then open the flow.
- Select Run history.
From the Dashboard, selecting a flow's Runs count opens the same tab.
Columns
| Column | What it shows |
|---|---|
| Started | When the run started. A Retry tag marks a retry job. |
| Status | In progress, Waiting in queue, Canceling, Canceled, Completed, or Failed. Each status has its own color, so a column with a lot of one color stands out. For a canceled run, select the info icon next to the status to see who canceled it. |
| Completed | When the run finished. |
| Duration | How long the run took. |
| Success, Ignored, Errors | The record counts for the run. Select the Errors count to open the run's errors; see Unified error view. |
| Pages | How many pages of records the run processed. |
| Run logs | Opens the execution logs for the run, or for a step in it; see View flow run logs. |
| Triggered by | For a retry job, who started it: your name when you retried from the UI, system when integrator.io retried automatically. Empty for flow runs. |
|
Actions |
Cancel a run that's in progress; see Cancel a flow run. |
Filter the list
- Search narrows the list to runs that match the text you enter.
- Date range offers Today, Yesterday, Last 24 hours, Last 7 days, Last 15 days, Last 30 days, and Custom. The presets suit flows that run daily or less often; Custom takes a start and end date and, optionally, a time of day on each — for example, 10/20 to 10/23 between 12:00 AM and 1:00 PM — which is the quickest way to find one run among many.
-
Status
in the column heading limits the list to the statuses you select. With Canceled selected, Canceled by narrows it further to runs canceled by a particular user or by the system.
-
Filter
next to the date range offers Hide empty runs (runs whose Success, Ignored, and Errors counts are all zero), Hide retry runs, and a filter for runs that contain errors.
Retry jobs in the run history
When records are retried, each retry appears in the run history as its own job, marked with a Retry tag and listed alongside the flow runs, so you can follow how a record moved through each step. By default a retry job shows every downstream step. Retry jobs can be running or completed, you can cancel a running one from Actions, and their logs are captured like any run's; select Run logs on a step in the retry job to see how it ran. The same Retry tag appears in the Run console in Flow builder; see Run a flow.
Delete logs deletes the flow's stored execution logs; see View flow run logs.